Engineering Design Portfolio
Make a robot to write out phrases and draw for me
Designed and printed a fully functional speedcube.
Sustainability Award: zero emmission train that delievers solar energy to urban area
Human-oriented design challenge
Uploaded videos to share unique farm designs and tutorials
Upper body exoskeleton designed that aids in pushing and pulling motion
Design Competition: Waste collection system that sorts garbage from recycling
Analog and digital clock that runs in sync through Arduino software
I am a mechanical engineering major in the Schreyer Honors College at Penn State. During my time in school, I have had the opportunity to design and build unique projects, both in and out of the classroom.